1. Introduction
1.1 Time Value of Money
Most people are aware that money in hand is more precious than the money collected in the future. We can utilize it to run a business, buy something now and sell it later for a profit, or just put it in the bank to generate interest. Future currency is also worth less since inflation erodes its purchasing power(Gallo, 2014). This concept is known as the time value of money. But how precisely do we compare the present worth of money to its future value? Herein lies the role of net present value(Dan, 2013).
1.2 Need of NPV
Net present value is the present value of the cash flows of an Firestone Diamonds Plc project at the needed rate of return relative to the initial investment(Gallo, 2014).
It is a method for determining the return on investment, or ROI, for a project or expenditure. Firestone Diamonds Plc can determine whether the project is worthwhile by calculating the investment's expected returns in today's dollars and comparing them to the project's cost(Dan, 2013).
2. Desirability of NPV
Internal rate of return, payback method, and net present value are the three options typically offered to Firestone Diamonds Plc's Company manager when comparing projects and deciding whether to pursue. The majority of financial experts choose to use the net present value, also known as NPV. That is the case for two reasons, which are elucidated in the subsequent paragraphs.
2.1 The advantage over Payback Method
First, NPV examines the time value of money by transforming future cash flows into present-day dollars. Two, it provides a precise figure that Firestone Diamonds Plc may use to compare initial cash spent with the present return value (Dikov, 2020).
According to the co-founder and proprietor of business-literacy.com, it is vastly superior to the payback approach, which is the most prevalent(Knight, 2014).
The allure of payback is that it is easy to compute and comprehend: when will Firestone Diamonds Plc recoup its initial investment? It does not, however, account for the fact that the purchasing power of money today is larger than that of the same amount of money in the future. According to Knight, this is why NPV is the preferable method (2014).
2.2 Convenience of Use
Thanks to financial calculators and Excel spreadsheets, NPV is now that simple to compute. Firestone Diamonds Plc can also utilize NPV to determine whether or not to make significant acquisitions, such as equipment or software. Firestone Diamonds Plc Companycan also utilize it in mergers and acquisitions, albeit, in this case, it is referred to as the discounted cash flow model. In fact, this is the methodology that Warren Buffet employs when evaluating businesses. NPV is an excellent choice if a corporation uses present-day dollars to estimate future returns(Knight, 2014)
3. Procedure
3.1 Discount Factor
The discount factor formula provides a method for determining the net present value (NPV) for Firestone Diamonds Plc. It is a weighted word used in mathematics and economics to identify the precise factor by which the value is multiplied to get at the net present value as of today.
This is widely used in corporate budgeting to analyze whether a proposal would bring future value.
3.2 Difference between Discount Rate and Discount Factor
Any discount factor equation assumes that money will be worth less in the future owing to causes such as inflation, resulting in a discount factor value between zero and one. The discount factor and discount rate are closely connected; however, whereas the discount rate considers the present value of future cash flows, the discount factor applies to the net present value.
With these numbers, Firestone Diamonds Plc can predict the predicted earnings or losses of an investment and its net future value.
3.3 Formula
The formula Firestone Diamonds Plc can use for the general discount factor is (Thakur, 2018):
Discount Factor= 1/(1*(1+Discount Rate)^(Period Number) )
3.4 Methodology
To utilize this formula, the periodic interest rate or discount rate must be determined by Firestone Diamonds Plc. This is simply calculated by dividing the yearly discount factor interest rate by the number of annual payments.
Additionally, Firestone Diamonds Plc will want the total number of payments that will be paid. To perform these computations, Firestone Diamonds Plc can generate a discount factor template or table in Excel by inserting the aforementioned formula with our own values. Firestone Diamonds Plcwill compute it the following way:
Period |
1 | 2 | 3 | 4 |
Cash Flow |
£100,000 |
£100,000 |
£100,000 |
£100,000 |
=1/1*(1+£C£4)^C2) |
=1/1*(1+£C£4)^D2) |
=1/1*(1+£C£4)^E2) |
=1/1*(1+£C£4)^F2) |
|
Discount Factor |
0.93 |
0.86 |
0.79 |
0.74 |
This demonstrates the diminishing discount factor with time, whether it is an annual discount factor or a shorter
time frame to match our accounting period. This applies whether the time range reflects an annual discount factor or a
shorter time frame.
For instance, to determine the discount factor for a cash flow that will occur one year from now, all that needs to be done by Firestone Diamonds Plc is divide one by the interest rate plus one. If the interest rate was 5%, the discount factor would be calculated as 1 less than 1.05, which is equivalent to 95%.
3.5 Usage in NPV Analysis
After Firestone Diamonds Plchas computed their discount factor and discount rate, they will be able to apply these two factors to the problem of determining the net present value of an investment. The total present value of all positive cash flows should be added together, and the total present value of all negative cash flows should be subtracted.
After making the appropriate calculations using the interest rate, Firestone Diamonds Plc will arrive at the net present value. Many discount factor calculators available online will apply these formulas; alternatively, Firestone Diamonds Plc may perform an analysis using Excel.
4. Net Present Value
4.1 Case 1: Variable Cash Flow
Calculating both the expenses (which result in negative cash flows) and the benefits allow Firestone Diamonds Plcto arrive at the Net Present Value of a series of cash flows (positive cash flows).This is accomplished by the utilization of the following formula(Indeed Editorial Team, 2021):
NPV= ∑_(t=0)^n▒〖CF〗_t/〖(1+i)〗^t
Where CFt denotes the cash flow during the period, n is the total number of periods, t denotes the currently active period, and I represent the discount rate of Firestone Diamonds Plc(Dikov, 2020).
4.2 Case 2: Constant Cash Flow
The following is an example of a basic finite geometric series that may be used to express the formula if Firestone Diamonds Plc projects a consistent cash flow year after year(Indeed Editorial Team, 2021):
NPV= CF*((1-(1/(1+i))^(n+1))/(1- (1/(1+i)) ))
Where CF represents the continuous cash flow throughout each period, n represents the total number of periods, and I is the discount rate for Firestone Diamonds Plc(Dikov, 2020).
5. NPV in Capital Budgeting
5.1 Nature of the Project
Before Firestone Diamonds Plc can use net present value to evaluate a capital investment project, we will first need to determine if the project in question is independent or part of a chain of mutually exclusive projects (Taylor, 2017).
5.1.1 Independent
It refers to endeavors that are not influenced by the revenue flows generated by other initiatives.
5.1.2 Mutually Exclusive
If two projects are mutually exclusive, it indicates that there are two approaches to achieve the same outcome and cannot be done simultaneously. For example, it's possible that Firestone Diamonds Plc may request bids on a certain project and that they've gotten several of those bids.
Firestone Diamonds Plc should avoid the temptation to take two different bids for the same project. That illustrates a project that cannot coexist with another(Carlson, 2021).
5.2 Decision Rules
Every approach to budgeting capital expenses includes a list of decision rules. For instance, the decision rule for the payback period approach states that Firestone Diamonds Plc must agree to move forward with the project if it is able to earn back its initial investment in a predetermined amount of time(Luehrman, 2016).
The same decision rule should be used when applying the discounted payback time technique. The concept of net present value comes with its own set of decision criteria, which are as follows:
5.2.1 Case 1: Independent Project
Firestone Diamonds Plc should accept the proposal if the NPV is larger than zero.
5.2.2 Case 2: Mutually Exclusive Projects
If the net present value (NPV) of one project is larger than the NPV of the other project, then Firestone Diamonds Plc will accept the project with the higher NPV. If both initiatives' net present value (NPV)s negative, then neither project should be pursued(Tamplin, 2021).
Consider the following scenario as we go through the process:
5.3 An Example
Let's say that the Firestone Diamonds Plc is thinking about two different initiatives: A and B. Firestone Diamonds Plc’sCompanycost of capital for each individual project is ten percent, and the initial investment is ten thousand dollars.
Firestone Diamonds Plc is interested in determining and analyzing the difference in the net present value of these cash flows between the two projects. Every project has a different pattern of incoming funding. To put it another way, the cash flows do not constitute annuities.
5.3.1 Cash Flows
Firestone Diamonds Plc wishes to compute the NPV for each project. The cash flows in each of the four years of Project A are as follows: $5,000, $4,000, $3,000, and $1,000, respectively. Project A is a four-year endeavor. The cash flows in each of the four years of Project B are as follows: $1,000, $3,000, $4,000, and $6,750, respectively. Project B is also a four-year Endeavor.
5.3.2 Calculation
To calculate the NPV of the project, Firestone Diamonds Plcstarts by adding the cash flow from Year 0, which represents the initial investment in the project, to the cash flows from the remaining years of the project.
The original investment results in a negative cash flow and is therefore expressed as a negative figure. In this illustration, the cash flows for each project for years 1 through 4 are all exemplified by positive numbers.
To get the NPV for Project A, Firestone Diamonds Plcfollows these steps:
NPV(A) = (-$10,000) + $5,000/(1.10)1 + $4,000/(1.10)2 + $3,000/(1.10)3 + $1,000/(1.10)4
10% | 0 | 1 | 2 | 3 | 4 |
CFs | -10,000 | 5,000 | 4,000 | 3,000 | 1,000 |
NPV | 716.54 |
The NPV of Project A is $716.54, which indicates that investing in the project increases the firm's value by $716.54.
For Project B:
NPV(B) = (-$10,000) + $1,000/(1.10)1 + $3,000/(1.10)2 + $4,000/(1.10)3 + $6,750/(1.10)4
10% | 0 | 1 | 2 | 3 | 4 |
CFs | -10,000 | 1,000 | 3,000 | 4,000 | 6,750 |
NPV | 912.75 |
Since Project B has a higher NPV than A, Firestone Diamonds Plccan safely choose Project B instead of A based on our analysis.
6. NPV in Stock Valuation
The most popular approach for evaluating the value of Firestone Diamonds Plc shares is the Discounted Cash Flow (DCF) model, which employs Net Present Value (NPV) in its calculation. The DCF model methodology is explained below.
6.1 Initial Steps
Beginning with the revenue statement of Firestone Diamonds Plc, we project future (typically five) years' income and expenses(Probasco, 2021). Then, projections are made for fixed assets and changes in the working capital of Firestone Diamonds Plc
. The second level is capital structure projection. Depending on the type of DCF model being constructed, the most frequent strategy is to maintain the Firestone Diamonds Plccurrent capital structure, assuming no major changes other than those that are known, such as debt maturity(CFI, 2022).
6.2 Terminal Value
The terminal value, a crucial component of a DCF model, is then calculated. It frequently accounts for more than 50 percent of the Firestone Diamonds Plcnet present value, especially if the forecast term is five years or less. There are two methods for calculating the terminal value: the perpetual growth rate method and the exit multiple methods (Matthiessen, 2019).
6.2.1 Perpetual Growth Rate Method
The perpetual growth rate method assumes that the cash flow created at the end of the projected period rises at a constant rate in perpetuity. Consider that another company is looking to acquire
Company Firestone Diamonds Plc, whose cash is $10 million, grows at a rate of 2% indefinitely, with a cost of capital of 15%. $10 million / (15 percent - 2 percent) = $77 million is the terminal value.
6.2.2 Exit Multiple Method
Using the exit multiple method, it is assumed that Firestone Diamonds Plcwas sold for the price that a reasonable buyer would pay. This often entails an EV/EBITDA multiple equal to or close to the current market values of comparable companies. As seen in the following example, if Firestone Diamonds Plc has $6.3 million in EBITDA and comparable businesses are trading at 8x, then the terminal value is $6.3 million x 8 = $50 million.
Entry |
2018 |
2019 |
2020 |
2021 |
2022 |
Exit |
|
Date |
31/12/17 |
30/06/18 |
30/06/19 |
30/06/20 |
30/06/21 |
30/06/22 |
30/06/22 |
Time Periods | 0 | 1 | 2 | 3 | 4 | ||
Year Fraction | 0.5 | 1 | 1 | 1 | 1 | ||
EBIT | 47,814 | 51,095 | 55,861 | 58,693 | 63,039 | ||
Less: Cash Taxes | 11,954 | 12,774 | 13,965 | 14,673 | 15,760 | ||
Plus: D&A | 15,008 | 15,005 | 15,003 | 15,002 | 15,001 | ||
Less: Capex | 15,000 | 15,000 | 15,000 | 15,000 | 15,000 | ||
Less: Cgs NWC | 375 | 611 | 398 | 511 | 272 | ||
Unlevered FCF | 35,494 | 37,715 | 41,501 | 43,510 | 47,008 | ||
(Entry)/Exit | -290,450 | 542,129 | |||||
Transaction CF | - | 17,747 | 37,715 | 41,501 | 43,510 | 47,008 | 542,129 |
Transaction CF | -290,450 | 17,747 | 37,715 | 41,501 | 43,510 | 47,008 | 542,129 |
Intrinsic Value |
|
Enterprise Value | 462,983 |
Plus: Cash | 239,550 |
Less: Debt | 30,000 |
Equity Value | 672,532 |
Equity Value/Share | 33.63 |
Terminal Value |
|
Perpetual Growth | 537,981 |
EV/EBITDA | 546,278 |
Average | 542,129 |
6.2.3 Decision
If we want to determine the equity value of Firestone Diamonds Plc, we must adjust the net present value (NPV) of the unlevered free cash flow for cash and equivalents, debt, and any minority stake(Ahern, 2022). This yields the equity value, which may then be divided by the number of shares to obtain the share price. Then, we may determine whether the stock of Firestone Diamonds Plcis overvalued or undervalued and decide whether to purchase or sell it.
7. Assumptions
Even though the discounted value of future cash flows is not a statement that non-financial individuals easily utter still, it is worthwhile to explain and present NPV due to its superiority, as any investment that passes the net present value test will improve shareholder value. In contrast, any project that fails would actually harm the company and its shareholders if carried out anyhow(Entras, 2016).
There are three potential estimation errors that will have a significant impact on the final outcomes of our calculation.
7.1 Initial Expenditure
First, there is the initial expenditure(Kristiani, 2022). Does Firestone Diamonds Plc know how much the project or expense will cost? There is no risk when purchasing a piece of equipment with a visible price tag. But if Firestone Diamonds Plc is modernizing its IT system and estimating staff time and resources, the project timetable, and how much it will pay external vendors, the numbers can vary significantly(Jones & Smith, 1982).
7.2 Discount Rate
There are further dangers associated with the discount rate. Firestone Diamonds Plc is applying today's rate to future returns, so there is a potential that, for example, in Year Three of the project, interest rates will skyrocket, and the cost of their money will increase(Ionos, 2019).
This would imply that Firestone Diamonds Plc’sreturns for that year will be lower than anticipated.
7.3 Anticipated Returns
Third, Firestone Diamonds Plc must be confident in the anticipated returns of the project(Mendell, 2020). These forecasts are typically optimistic since people want to complete the project or purchase the equipment(Bey, Doersch, & Patterson, 1981). This, however, can lead to erroneous NPV calculations.
8. Sensitivity Analysis
Given that the computation is based on a number of assumptions and approximations, there is a considerable possibility of a mistake. After our initial computation, Firestone Diamonds Plc can mitigate the risks by double-checking our calculations and conducting sensitivity(Borgonovo & Peccati, 2004). The following is one illustration:
8.1 An Example
Cash Flow projections for the following 12 years are offered for Company Firestone Diamonds Plc(see below). Capital cost is eight percent. Assuming the variables remain constant, we calculate the Firestone Diamonds Plc’s Net Present Value (NPV).
Sensitivity Analysis |
||
Year 0 |
Years 1 - 12 |
|
Investment | ($5,400.00) ” | |
Sales | $16,000.00 | |
Variable Costs | $13,000.00 | |
Fixed Costs | $2,000.00 | |
Depreciation | $450.00 | |
Pretax Profit | $550.00 | |
Taxes (40%) | $220.00 | |
Profit After Tax | $330.00 | |
Operating Cash flow | $780.00 | |
Net Cash Flow | ($5,400.00) ” | $780.00 |
NPV | $470.25 |
Possible Outcomes |
|||
Variable |
Pessimistic |
Expected |
Optimistic |
Investment | 5800 | 5400 | 5000 |
Sales | 14000 | 16000 | 18000 |
Variable Costs | 11620 which is 83% of Sales | 13000 which is 80.25% of Sales | 14400 which is 80% of Sales |
Fixed Costs | 2100 | 2000 | 1900 |
NPV | ($121.00) ” | $470.25 | $778.00 |
9. Conclusion
NPV's significance in predicting the future of Firestone Diamonds Plc and its projects is undeniable and an indispensable tool within the field of Financial Analysis. However, it must be remembered that it is expressed in absolute rather than relative terms and hence does not account for the magnitude of the investment, Firestone Diamonds Plc opportunity costs, or the project's duration. In light of the limitations and benefits of NPV, it is imperative for Firestone Diamonds Plc not to rely solely on it and to undertake assessments using alternative approaches, such as IRR, to be certain.
10. Works Cited
Ahern, D. (2022, June 15). Explaining the DCF Model. Retrieved from eB: https://einvestingforbeginners.com/dcf-valuation/
Bey, R. B., Doersch, R. H., & Patterson, J. H. (1981). The Net Present Value Criterion. Project Management Quarterly, 12(2), 35-45.
Borgonovo, E., & Peccati, L. (2004). Sensitivity Analysis In Investment Project Evaluation. International Journal of Production Economics, 90(1), 17-25.
Carlson, R. (2021, February 8). NPV as a Capital Budgeting Method. Retrieved from The Balance: Small Business: https://www.thebalancesmb.com/net-present-value-npv-as-a-capital-budgeting-method-392915
CFI. (2022, June 2). DCF Model Training. Retrieved from Corporate Finance Institute: https://corporatefinanceinstitute.com/resources/knowledge/modeling/dcf-model-training-free-guide/
Dan. (2013, July 24). Time Value of Money. Retrieved from The Strategic CFO: https://strategiccfo.com/articles/accounting/time-value-of-money/
Dikov, D. (2020, March 13). NPV in Financial Analysis. Retrieved from Magnimetrics: https://magnimetrics.com/net-present-value-npv-in-financial-analysis/
Entras. (2016, April 1). NPV of a Business Case: Common Pitfalls. Retrieved from Entras: https://www.entras.be/news/npv-of-a-business-case-common-pitfalls/
Gallo, A. (2014, November 1). A Refresher on Net Present Value. Retrieved from Harvard Business Review: https://hbr.org/2014/11/a-refresher-on-net-present-value
Indeed Editorial Team. (2021, December 9). How To Calculate Net Present Value. Retrieved from Indeed: https://www.indeed.com/career-advice/career-development/calculate-npv
Ionos. (2019, April 19). What is Net Present Value. Retrieved from Ionos: https://www.ionos.com/startupguide/grow-our-business/what-is-net-present-value/
Jones, T. W., & Smith, J. D. (1982). A Historical Perspective Of Net Present Value And Equivalent Annual Cost. The Accounting Historians Journal, 9, 103-110.
Juhász, L. (2011). Net Present Value Versus Internal Rate Of Return. Economics Sociology, 4(1), 46-53.
Knight, J. (2014, August 1). Financial Intelligence. (A. Gallo, Interviewer)
Kristiani, V. M. (2022, March 5). Net Present Value. Retrieved from Hashmicro: https://www.hashmicro.com/blog/net-present-value-npv/
Luehrman, T. A. (2016, June 10). NPV and Capital Budgeting. Retrieved from Harvard Business Publishing: https://hbsp.harvard.edu/product/5176-PDF-ENG
Matthiessen, A. (2019, March 20). Startup valuation. Retrieved from EY: https://www.ey.com/en_nl/finance-navigator/startup-valuation-applying-the-discounted-cash-flow-method-in-six-easy-steps
Mendell, B. (2020, May 31). Pros and Cons of Using NPV. Retrieved from Forisk: https://forisk.com/blog/2020/05/31/pros-and-cons-of-using-net-present-value-npv/
Probasco, J. (2021, October 20). Net present value: One way to determine the viability of an investment. Retrieved from Business Insider: https://www.businessinsider.com/personal-finance/npv
QS Study. (2018, May 10). Limitations of NPV. Retrieved from QS Study: https://qsstudy.com/limitations-net-present-value-npv/
Tamplin, T. (2021, September 21). Capital Budgeting: Important Problems and Solutions. Retrieved from Finance Strategists: https://learn.financestrategists.com/explanation/management-accounting/capital-budgeting-important-problems-and-solutions/
Taylor, P. (2017, May 13). NPV Analysis. Retrieved from Stantec: https://www.stantec.com/content/dam/stantec/files/PDFAssets/UK/uk-net-present-value-brochure.pdf
Thakur, M. (2018, February 7). Discount Factor Formula. Retrieved from Educba: https://www.educba.com/discount-factor-formula/
Warning! This article is only an example and cannot be used for research or reference purposes. If you need help with something similar, please submit your details here.
Related Articles
- Corporate Social Responsibility of Firestone Diamonds Plc
- Firestone Diamonds Plc 5C Marketing Analysis
- The vision statement of Firestone Diamonds Plc
- Organizational Culture of Firestone Diamonds Plc
- Firestone Diamonds Plc Generic and Intensive Growth Strategies
- Marketing Mix Firestone Diamonds Plc
- Firestone Diamonds Plc PESTEL & Environment Analysis
- Firestone Diamonds Plc Porter Five Forces Analysis
- Firestone Diamonds Plc SWOT Analysis / SWOT Matrix
- Value Chain Analysis Of Firestone Diamonds Plc
- Marketing Strategy Of Firestone Diamonds Plc
- Firestone Diamonds Plc Case Solution
- Ansoff Matrix of Firestone Diamonds Plc
- Blue Ocean Strategy of Firestone Diamonds Plc
- Hofstede Cultural Model of Firestone Diamonds Plc
- Porters Diamond Model of Firestone Diamonds Plc
- Mckinsey 7s Framework Of Firestone Diamonds Plc
- Resource Based View Of The Firm - Firestone Diamonds Plc
- VRIN/VRIO Analysis Of Firestone Diamonds Plc
- WACC for Firestone Diamonds Plc
Juliet Rowan
5.0
Amazing, really it’s a wonderful service because they completed my essay within six hours. Keep it up!
Zara Daniel
5.0
A very cheap service at reasonable charges. I can trust on this service from now. Highly recommended!
Angelina Gosha
5.0
The staff was very helpful and responded to me very quickly. Definitely, I will use this custom paper writing service. Thnx!
Grace Matt
5.0
I've been using this for years. The support team updated me well concerning every step of the assignment; that is why I didn't feel the need for the modification of the document.
Zhu Ruo
5.0
This service has been in the market for a long time because my elder brother took help from it many times. Plagiarism free and original academic paper! Thank you!
Tanay Dipankar
5.0
This service saved my prices when I paid them because they have an organized system of online banking. It was the main issue for me that this service sorted out. Very thanks for getting myself for being anonymous.
Next Articles
- 8685-Fresnillo-Plc-Net-Present-Value-Analysis
- 8686-Galantas-Gold-Corporation-Net-Present-Value-Analysis
- 8687-Galileo-Resources-Plc-Net-Present-Value-Analysis
- 8688-Gcm-Resources-Plc-Net-Present-Value-Analysis
- 8689-Gem-Diamonds-Limited-Net-Present-Value-Analysis
- 8690-Georgian-Mining-Corporation-Net-Present-Value-Analysis
- 8691-Glencore-Plc-Net-Present-Value-Analysis
- 8692-Golden-Saint-Resources-Ltd-Net-Present-Value-Analysis
- 8693-Goldplat-Plc-Net-Present-Value-Analysis
- 8694-Goldstone-Resources-Limited-Net-Present-Value-Analysis
Previous Articles
- 8682-Ferrexpo-Plc-Net-Present-Value-Analysis
- 8681-Evraz-Plc-Net-Present-Value-Analysis
- 8679-Eurasia-Mining-Plc-Net-Present-Value-Analysis
- 8678-Elementis-Plc-Net-Present-Value-Analysis
- 8677-Edenville-Energy-Plc-Net-Present-Value-Analysis
- 8676-Ecr-Minerals-Plc-Net-Present-Value-Analysis
- 8675-Directa-Plus-Plc-Net-Present-Value-Analysis
- 8674-Dalradian-Resources-Inc-Net-Present-Value-Analysis
- 8673-Cropper-James-Plc-Net-Present-Value-Analysis
- 8672-Cronin-Group-Plc-Net-Present-Value-Analysis
Be a Great Writer or Hire a Greater One!
Academic writing has no room for errors and mistakes. If you have BIG dreams to score BIG, think out of the box and hire Essay48 with BIG enough reputation.
Our Guarantees
Interesting Fact
Most recent surveys suggest that around 76 % students try professional academic writing services at least once in their lifetime!