1.1 Time Value of Money
Most people are aware that money in hand is more precious than the money collected in the future. We can utilize it to run a business, buy something now and sell it later for a profit, or just put it in the bank to generate interest. Future currency is also worth less since inflation erodes its purchasing power(Gallo, 2014). This concept is known as the time value of money. But how precisely do we compare the present worth of money to its future value? Herein lies the role of net present value(Dan, 2013).
1.2 Need of NPV
Net present value is the present value of the cash flows of an Steppe Cement Ltd project at the needed rate of return relative to the initial investment(Gallo, 2014).
It is a method for determining the return on investment, or ROI, for a project or expenditure. Steppe Cement Ltd can determine whether the project is worthwhile by calculating the investment's expected returns in today's dollars and comparing them to the project's cost(Dan, 2013).
2. Desirability of NPV
Internal rate of return, payback method, and net present value are the three options typically offered to Steppe Cement Ltd's Company manager when comparing projects and deciding whether to pursue. The majority of financial experts choose to use the net present value, also known as NPV. That is the case for two reasons, which are elucidated in the subsequent paragraphs.
2.1 The advantage over Payback Method
First, NPV examines the time value of money by transforming future cash flows into present-day dollars. Two, it provides a precise figure that Steppe Cement Ltd may use to compare initial cash spent with the present return value (Dikov, 2020).
According to the co-founder and proprietor of business-literacy.com, it is vastly superior to the payback approach, which is the most prevalent(Knight, 2014).
The allure of payback is that it is easy to compute and comprehend: when will Steppe Cement Ltd recoup its initial investment? It does not, however, account for the fact that the purchasing power of money today is larger than that of the same amount of money in the future. According to Knight, this is why NPV is the preferable method (2014).
2.2 Convenience of Use
Thanks to financial calculators and Excel spreadsheets, NPV is now that simple to compute. Steppe Cement Ltd can also utilize NPV to determine whether or not to make significant acquisitions, such as equipment or software. Steppe Cement Ltd Companycan also utilize it in mergers and acquisitions, albeit, in this case, it is referred to as the discounted cash flow model. In fact, this is the methodology that Warren Buffet employs when evaluating businesses. NPV is an excellent choice if a corporation uses present-day dollars to estimate future returns(Knight, 2014)
3. Procedure
3.1 Discount Factor
The discount factor formula provides a method for determining the net present value (NPV) for Steppe Cement Ltd. It is a weighted word used in mathematics and economics to identify the precise factor by which the value is multiplied to get at the net present value as of today.
This is widely used in corporate budgeting to analyze whether a proposal would bring future value.
3.2 Difference between Discount Rate and Discount Factor
Any discount factor equation assumes that money will be worth less in the future owing to causes such as inflation, resulting in a discount factor value between zero and one. The discount factor and discount rate are closely connected; however, whereas the discount rate considers the present value of future cash flows, the discount factor applies to the net present value.
With these numbers, Steppe Cement Ltd can predict the predicted earnings or losses of an investment and its net future value.
3.3 Formula
The formula Steppe Cement Ltd can use for the general discount factor is (Thakur, 2018):
Discount Factor= 1/(1*(1+Discount Rate)^(Period Number) )
3.4 Methodology
To utilize this formula, the periodic interest rate or discount rate must be determined by Steppe Cement Ltd. This is simply calculated by dividing the yearly discount factor interest rate by the number of annual payments.
Additionally, Steppe Cement Ltd will want the total number of payments that will be paid. To perform these computations, Steppe Cement Ltd can generate a discount factor template or table in Excel by inserting the aforementioned formula with our own values. Steppe Cement Ltdwill compute it the following way:
Period |
1 | 2 | 3 | 4 |
Cash Flow |
£100,000 |
£100,000 |
£100,000 |
£100,000 |
=1/1*(1+£C£4)^C2) |
=1/1*(1+£C£4)^D2) |
=1/1*(1+£C£4)^E2) |
=1/1*(1+£C£4)^F2) |
|
Discount Factor |
0.93 |
0.86 |
0.79 |
0.74 |
This demonstrates the diminishing discount factor with time, whether it is an annual discount factor or a shorter
time frame to match our accounting period. This applies whether the time range reflects an annual discount factor or a
shorter time frame.
For instance, to determine the discount factor for a cash flow that will occur one year from now, all that needs to be done by Steppe Cement Ltd is divide one by the interest rate plus one. If the interest rate was 5%, the discount factor would be calculated as 1 less than 1.05, which is equivalent to 95%.
3.5 Usage in NPV Analysis
After Steppe Cement Ltdhas computed their discount factor and discount rate, they will be able to apply these two factors to the problem of determining the net present value of an investment. The total present value of all positive cash flows should be added together, and the total present value of all negative cash flows should be subtracted.
After making the appropriate calculations using the interest rate, Steppe Cement Ltd will arrive at the net present value. Many discount factor calculators available online will apply these formulas; alternatively, Steppe Cement Ltd may perform an analysis using Excel.
4. Net Present Value
4.1 Case 1: Variable Cash Flow
Calculating both the expenses (which result in negative cash flows) and the benefits allow Steppe Cement Ltdto arrive at the Net Present Value of a series of cash flows (positive cash flows).This is accomplished by the utilization of the following formula(Indeed Editorial Team, 2021):
NPV= ∑_(t=0)^n▒〖CF〗_t/〖(1+i)〗^t
Where CFt denotes the cash flow during the period, n is the total number of periods, t denotes the currently active period, and I represent the discount rate of Steppe Cement Ltd(Dikov, 2020).
4.2 Case 2: Constant Cash Flow
The following is an example of a basic finite geometric series that may be used to express the formula if Steppe Cement Ltd projects a consistent cash flow year after year(Indeed Editorial Team, 2021):
NPV= CF*((1-(1/(1+i))^(n+1))/(1- (1/(1+i)) ))
Where CF represents the continuous cash flow throughout each period, n represents the total number of periods, and I is the discount rate for Steppe Cement Ltd(Dikov, 2020).
5. NPV in Capital Budgeting
5.1 Nature of the Project
Before Steppe Cement Ltd can use net present value to evaluate a capital investment project, we will first need to determine if the project in question is independent or part of a chain of mutually exclusive projects (Taylor, 2017).
5.1.1 Independent
It refers to endeavors that are not influenced by the revenue flows generated by other initiatives.
5.1.2 Mutually Exclusive
If two projects are mutually exclusive, it indicates that there are two approaches to achieve the same outcome and cannot be done simultaneously. For example, it's possible that Steppe Cement Ltd may request bids on a certain project and that they've gotten several of those bids.
Steppe Cement Ltd should avoid the temptation to take two different bids for the same project. That illustrates a project that cannot coexist with another(Carlson, 2021).
5.2 Decision Rules
Every approach to budgeting capital expenses includes a list of decision rules. For instance, the decision rule for the payback period approach states that Steppe Cement Ltd must agree to move forward with the project if it is able to earn back its initial investment in a predetermined amount of time(Luehrman, 2016).
The same decision rule should be used when applying the discounted payback time technique. The concept of net present value comes with its own set of decision criteria, which are as follows:
5.2.1 Case 1: Independent Project
Steppe Cement Ltd should accept the proposal if the NPV is larger than zero.
5.2.2 Case 2: Mutually Exclusive Projects
If the net present value (NPV) of one project is larger than the NPV of the other project, then Steppe Cement Ltd will accept the project with the higher NPV. If both initiatives' net present value (NPV)s negative, then neither project should be pursued(Tamplin, 2021).
Consider the following scenario as we go through the process:
5.3 An Example
Let's say that the Steppe Cement Ltd is thinking about two different initiatives: A and B. Steppe Cement Ltd’sCompanycost of capital for each individual project is ten percent, and the initial investment is ten thousand dollars.
Steppe Cement Ltd is interested in determining and analyzing the difference in the net present value of these cash flows between the two projects. Every project has a different pattern of incoming funding. To put it another way, the cash flows do not constitute annuities.
5.3.1 Cash Flows
Steppe Cement Ltd wishes to compute the NPV for each project. The cash flows in each of the four years of Project A are as follows: $5,000, $4,000, $3,000, and $1,000, respectively. Project A is a four-year endeavor. The cash flows in each of the four years of Project B are as follows: $1,000, $3,000, $4,000, and $6,750, respectively. Project B is also a four-year Endeavor.
5.3.2 Calculation
To calculate the NPV of the project, Steppe Cement Ltdstarts by adding the cash flow from Year 0, which represents the initial investment in the project, to the cash flows from the remaining years of the project.
The original investment results in a negative cash flow and is therefore expressed as a negative figure. In this illustration, the cash flows for each project for years 1 through 4 are all exemplified by positive numbers.
To get the NPV for Project A, Steppe Cement Ltdfollows these steps:
NPV(A) = (-$10,000) + $5,000/(1.10)1 + $4,000/(1.10)2 + $3,000/(1.10)3 + $1,000/(1.10)4
10% | 0 | 1 | 2 | 3 | 4 |
CFs | -10,000 | 5,000 | 4,000 | 3,000 | 1,000 |
NPV | 716.54 |
The NPV of Project A is $716.54, which indicates that investing in the project increases the firm's value by $716.54.
For Project B:
NPV(B) = (-$10,000) + $1,000/(1.10)1 + $3,000/(1.10)2 + $4,000/(1.10)3 + $6,750/(1.10)4
10% | 0 | 1 | 2 | 3 | 4 |
CFs | -10,000 | 1,000 | 3,000 | 4,000 | 6,750 |
NPV | 912.75 |
Since Project B has a higher NPV than A, Steppe Cement Ltdcan safely choose Project B instead of A based on our analysis.
6. NPV in Stock Valuation
The most popular approach for evaluating the value of Steppe Cement Ltd shares is the Discounted Cash Flow (DCF) model, which employs Net Present Value (NPV) in its calculation. The DCF model methodology is explained below.
6.1 Initial Steps
Beginning with the revenue statement of Steppe Cement Ltd, we project future (typically five) years' income and expenses(Probasco, 2021). Then, projections are made for fixed assets and changes in the working capital of Steppe Cement Ltd
. The second level is capital structure projection. Depending on the type of DCF model being constructed, the most frequent strategy is to maintain the Steppe Cement Ltdcurrent capital structure, assuming no major changes other than those that are known, such as debt maturity(CFI, 2022).
6.2 Terminal Value
The terminal value, a crucial component of a DCF model, is then calculated. It frequently accounts for more than 50 percent of the Steppe Cement Ltdnet present value, especially if the forecast term is five years or less. There are two methods for calculating the terminal value: the perpetual growth rate method and the exit multiple methods (Matthiessen, 2019).
6.2.1 Perpetual Growth Rate Method
The perpetual growth rate method assumes that the cash flow created at the end of the projected period rises at a constant rate in perpetuity. Consider that another company is looking to acquire
Company Steppe Cement Ltd, whose cash is $10 million, grows at a rate of 2% indefinitely, with a cost of capital of 15%. $10 million / (15 percent - 2 percent) = $77 million is the terminal value.
6.2.2 Exit Multiple Method
Using the exit multiple method, it is assumed that Steppe Cement Ltdwas sold for the price that a reasonable buyer would pay. This often entails an EV/EBITDA multiple equal to or close to the current market values of comparable companies. As seen in the following example, if Steppe Cement Ltd has $6.3 million in EBITDA and comparable businesses are trading at 8x, then the terminal value is $6.3 million x 8 = $50 million.
Entry |
2018 |
2019 |
2020 |
2021 |
2022 |
Exit |
|
Date |
31/12/17 |
30/06/18 |
30/06/19 |
30/06/20 |
30/06/21 |
30/06/22 |
30/06/22 |
Time Periods | 0 | 1 | 2 | 3 | 4 | ||
Year Fraction | 0.5 | 1 | 1 | 1 | 1 | ||
EBIT | 47,814 | 51,095 | 55,861 | 58,693 | 63,039 | ||
Less: Cash Taxes | 11,954 | 12,774 | 13,965 | 14,673 | 15,760 | ||
Plus: D&A | 15,008 | 15,005 | 15,003 | 15,002 | 15,001 | ||
Less: Capex | 15,000 | 15,000 | 15,000 | 15,000 | 15,000 | ||
Less: Cgs NWC | 375 | 611 | 398 | 511 | 272 | ||
Unlevered FCF | 35,494 | 37,715 | 41,501 | 43,510 | 47,008 | ||
(Entry)/Exit | -290,450 | 542,129 | |||||
Transaction CF | - | 17,747 | 37,715 | 41,501 | 43,510 | 47,008 | 542,129 |
Transaction CF | -290,450 | 17,747 | 37,715 | 41,501 | 43,510 | 47,008 | 542,129 |
Intrinsic Value |
|
Enterprise Value | 462,983 |
Plus: Cash | 239,550 |
Less: Debt | 30,000 |
Equity Value | 672,532 |
Equity Value/Share | 33.63 |
Terminal Value |
|
Perpetual Growth | 537,981 |
EV/EBITDA | 546,278 |
Average | 542,129 |
6.2.3 Decision
If we want to determine the equity value of Steppe Cement Ltd, we must adjust the net present value (NPV) of the unlevered free cash flow for cash and equivalents, debt, and any minority stake(Ahern, 2022). This yields the equity value, which may then be divided by the number of shares to obtain the share price. Then, we may determine whether the stock of Steppe Cement Ltdis overvalued or undervalued and decide whether to purchase or sell it.
7. Assumptions
Even though the discounted value of future cash flows is not a statement that non-financial individuals easily utter still, it is worthwhile to explain and present NPV due to its superiority, as any investment that passes the net present value test will improve shareholder value. In contrast, any project that fails would actually harm the company and its shareholders if carried out anyhow(Entras, 2016).
There are three potential estimation errors that will have a significant impact on the final outcomes of our calculation.
7.1 Initial Expenditure
First, there is the initial expenditure(Kristiani, 2022). Does Steppe Cement Ltd know how much the project or expense will cost? There is no risk when purchasing a piece of equipment with a visible price tag. But if Steppe Cement Ltd is modernizing its IT system and estimating staff time and resources, the project timetable, and how much it will pay external vendors, the numbers can vary significantly(Jones & Smith, 1982).
7.2 Discount Rate
There are further dangers associated with the discount rate. Steppe Cement Ltd is applying today's rate to future returns, so there is a potential that, for example, in Year Three of the project, interest rates will skyrocket, and the cost of their money will increase(Ionos, 2019).
This would imply that Steppe Cement Ltd’sreturns for that year will be lower than anticipated.
7.3 Anticipated Returns
Third, Steppe Cement Ltd must be confident in the anticipated returns of the project(Mendell, 2020). These forecasts are typically optimistic since people want to complete the project or purchase the equipment(Bey, Doersch, & Patterson, 1981). This, however, can lead to erroneous NPV calculations.
8. Sensitivity Analysis
Given that the computation is based on a number of assumptions and approximations, there is a considerable possibility of a mistake. After our initial computation, Steppe Cement Ltd can mitigate the risks by double-checking our calculations and conducting sensitivity(Borgonovo & Peccati, 2004). The following is one illustration:
8.1 An Example
Cash Flow projections for the following 12 years are offered for Company Steppe Cement Ltd(see below). Capital cost is eight percent. Assuming the variables remain constant, we calculate the Steppe Cement Ltd’s Net Present Value (NPV).
Sensitivity Analysis |
||
Year 0 |
Years 1 - 12 |
|
Investment | ($5,400.00) ” | |
Sales | $16,000.00 | |
Variable Costs | $13,000.00 | |
Fixed Costs | $2,000.00 | |
Depreciation | $450.00 | |
Pretax Profit | $550.00 | |
Taxes (40%) | $220.00 | |
Profit After Tax | $330.00 | |
Operating Cash flow | $780.00 | |
Net Cash Flow | ($5,400.00) ” | $780.00 |
NPV | $470.25 |
Possible Outcomes |
|||
Variable |
Pessimistic |
Expected |
Optimistic |
Investment | 5800 | 5400 | 5000 |
Sales | 14000 | 16000 | 18000 |
Variable Costs | 11620 which is 83% of Sales | 13000 which is 80.25% of Sales | 14400 which is 80% of Sales |
Fixed Costs | 2100 | 2000 | 1900 |
NPV | ($121.00) ” | $470.25 | $778.00 |
9. Conclusion
NPV's significance in predicting the future of Steppe Cement Ltd and its projects is undeniable and an indispensable tool within the field of Financial Analysis. However, it must be remembered that it is expressed in absolute rather than relative terms and hence does not account for the magnitude of the investment, Steppe Cement Ltd opportunity costs, or the project's duration. In light of the limitations and benefits of NPV, it is imperative for Steppe Cement Ltd not to rely solely on it and to undertake assessments using alternative approaches, such as IRR, to be certain.
10. Works Cited
Ahern, D. (2022, June 15). Explaining the DCF Model. Retrieved from eB: https://einvestingforbeginners.com/dcf-valuation/
Bey, R. B., Doersch, R. H., & Patterson, J. H. (1981). The Net Present Value Criterion. Project Management Quarterly, 12(2), 35-45.
Borgonovo, E., & Peccati, L. (2004). Sensitivity Analysis In Investment Project Evaluation. International Journal of Production Economics, 90(1), 17-25.
Carlson, R. (2021, February 8). NPV as a Capital Budgeting Method. Retrieved from The Balance: Small Business: https://www.thebalancesmb.com/net-present-value-npv-as-a-capital-budgeting-method-392915
CFI. (2022, June 2). DCF Model Training. Retrieved from Corporate Finance Institute: https://corporatefinanceinstitute.com/resources/knowledge/modeling/dcf-model-training-free-guide/
Dan. (2013, July 24). Time Value of Money. Retrieved from The Strategic CFO: https://strategiccfo.com/articles/accounting/time-value-of-money/
Dikov, D. (2020, March 13). NPV in Financial Analysis. Retrieved from Magnimetrics: https://magnimetrics.com/net-present-value-npv-in-financial-analysis/
Entras. (2016, April 1). NPV of a Business Case: Common Pitfalls. Retrieved from Entras: https://www.entras.be/news/npv-of-a-business-case-common-pitfalls/
Gallo, A. (2014, November 1). A Refresher on Net Present Value. Retrieved from Harvard Business Review: https://hbr.org/2014/11/a-refresher-on-net-present-value
Indeed Editorial Team. (2021, December 9). How To Calculate Net Present Value. Retrieved from Indeed: https://www.indeed.com/career-advice/career-development/calculate-npv
Ionos. (2019, April 19). What is Net Present Value. Retrieved from Ionos: https://www.ionos.com/startupguide/grow-our-business/what-is-net-present-value/
Jones, T. W., & Smith, J. D. (1982). A Historical Perspective Of Net Present Value And Equivalent Annual Cost. The Accounting Historians Journal, 9, 103-110.
Juhász, L. (2011). Net Present Value Versus Internal Rate Of Return. Economics Sociology, 4(1), 46-53.
Knight, J. (2014, August 1). Financial Intelligence. (A. Gallo, Interviewer)
Kristiani, V. M. (2022, March 5). Net Present Value. Retrieved from Hashmicro: https://www.hashmicro.com/blog/net-present-value-npv/
Luehrman, T. A. (2016, June 10). NPV and Capital Budgeting. Retrieved from Harvard Business Publishing: https://hbsp.harvard.edu/product/5176-PDF-ENG
Matthiessen, A. (2019, March 20). Startup valuation. Retrieved from EY: https://www.ey.com/en_nl/finance-navigator/startup-valuation-applying-the-discounted-cash-flow-method-in-six-easy-steps
Mendell, B. (2020, May 31). Pros and Cons of Using NPV. Retrieved from Forisk: https://forisk.com/blog/2020/05/31/pros-and-cons-of-using-net-present-value-npv/
Probasco, J. (2021, October 20). Net present value: One way to determine the viability of an investment. Retrieved from Business Insider: https://www.businessinsider.com/personal-finance/npv
QS Study. (2018, May 10). Limitations of NPV. Retrieved from QS Study: https://qsstudy.com/limitations-net-present-value-npv/
Tamplin, T. (2021, September 21). Capital Budgeting: Important Problems and Solutions. Retrieved from Finance Strategists: https://learn.financestrategists.com/explanation/management-accounting/capital-budgeting-important-problems-and-solutions/
Taylor, P. (2017, May 13). NPV Analysis. Retrieved from Stantec: https://www.stantec.com/content/dam/stantec/files/PDFAssets/UK/uk-net-present-value-brochure.pdf
Thakur, M. (2018, February 7). Discount Factor Formula. Retrieved from Educba: https://www.educba.com/discount-factor-formula/
Warning! This article is only an example and cannot be used for research or reference purposes. If you need help with something similar, please submit your details here.
Related Articles
- Corporate Social Responsibility of Steppe Cement Ltd
- Steppe Cement Ltd 5C Marketing Analysis
- The vision statement of Steppe Cement Ltd
- Organizational Culture of Steppe Cement Ltd
- Steppe Cement Ltd Generic and Intensive Growth Strategies
- Marketing Mix Steppe Cement Ltd
- Steppe Cement Ltd PESTEL & Environment Analysis
- Steppe Cement Ltd Porter Five Forces Analysis
- Steppe Cement Ltd SWOT Analysis / SWOT Matrix
- Value Chain Analysis Of Steppe Cement Ltd
- Marketing Strategy Of Steppe Cement Ltd
- Steppe Cement Ltd Case Solution
- Ansoff Matrix of Steppe Cement Ltd
- Blue Ocean Strategy of Steppe Cement Ltd
- Hofstede Cultural Model of Steppe Cement Ltd
- Porters Diamond Model of Steppe Cement Ltd
- Mckinsey 7s Framework Of Steppe Cement Ltd
- Resource Based View Of The Firm - Steppe Cement Ltd
- VRIN/VRIO Analysis Of Steppe Cement Ltd
- WACC for Steppe Cement Ltd
Zita Jazygian
5.0
The writer # 577282 helped me with the challenging questions of statistics. I’m thrilled with this service.
Isabella Harrison
5.0
I paid the reasonable cost and received the original assignment. I'm grateful!
Tang Gao
5.0
Everything was so fast and productive. The assignment was completely as per the directions but I desire to get extra discounts for the next order. Thanks!
Paula Diego
5.0
I don't like to tell my CGPA to anyone because it's not good but thank God that my son has this service that lends a helping hand to him during exams that build up his grades.
Leon David
5.0
It’s really a great service!
Mathilde
5.0
I am impressed because an experienced writer completed my paper. I will definitely turn back to this service for the dissertation. Grateful!
Next Articles
- 10235-Sthree-Plc-Net-Present-Value-Analysis
- 10236-St-Ives-Plc-Net-Present-Value-Analysis
- 10237-Stobart-Group-Ld-Net-Present-Value-Analysis
- 10238-Strat-Aero-Plc-Net-Present-Value-Analysis
- 10239-Styles-Wood-Group-Plc-Net-Present-Value-Analysis
- 10240-Sutton-Harbour-Holdings-Plc-Net-Present-Value-Analysis
- 10241-Symphony-Environmental-Technologies-Plc-Net-Present-Value-Analysis
- 10242-Synectics-Plc-Net-Present-Value-Analysis
- 10243-Tanfield-Group-Plc-Net-Present-Value-Analysis
- 10244-Tex-Holdings-Plc-Net-Present-Value-Analysis
Previous Articles
- 10233-Staffline-Group-Plc-Net-Present-Value-Analysis
- 10232-Stadium-Group-Plc-Net-Present-Value-Analysis
- 10231-Sprue-Aegis-Plc-Net-Present-Value-Analysis
- 10230-Spirax-Sarco-Engineering-Plc-Net-Present-Value-Analysis
- 10229-Speedy-Hire-Plc-Net-Present-Value-Analysis
- 10228-Spectris-Plc-Net-Present-Value-Analysis
- 10227-Spectra-Systems-Corporation-Net-Present-Value-Analysis
- 10226-Somero-Enterprise-Inc-Net-Present-Value-Analysis
- 10225-Solid-State-Plc-Net-Present-Value-Analysis
- 10224-Smurfit-Kappa-Group-Plc-Net-Present-Value-Analysis
Be a Great Writer or Hire a Greater One!
Academic writing has no room for errors and mistakes. If you have BIG dreams to score BIG, think out of the box and hire Essay48 with BIG enough reputation.
Our Guarantees
Interesting Fact
Most recent surveys suggest that around 76 % students try professional academic writing services at least once in their lifetime!