Net Present Value (NPV) Analysis of Hosted SP Outsourced Sharepoint
Posted by Sabrina Warren on Aug-01-2022
1. Introduction
1.1 Time Value of Money
Most people are aware that money in hand is more precious than the money collected in the future. We can utilize it to run a business, buy something now and sell it later for a profit, or just put it in the bank to generate interest. Future currency is also worth less since inflation erodes its purchasing power(Gallo, 2014). This concept is known as the time value of money. But how precisely do we compare the present worth of money to its future value? Herein lies the role of net present value(Dan, 2013).
1.2 Need of NPV
Net present value is the present value of the cash flows of an Hosted SP Outsourced Sharepoint project at the needed rate of return relative to the initial investment(Gallo, 2014).
It is a method for determining the return on investment, or ROI, for a project or expenditure. Hosted SP Outsourced Sharepoint can determine whether the project is worthwhile by calculating the investment's expected returns in today's dollars and comparing them to the project's cost(Dan, 2013).
2. Desirability of NPV
Internal rate of return, payback method, and net present value are the three options typically offered to Hosted SP Outsourced Sharepoint's Company manager when comparing projects and deciding whether to pursue. The majority of financial experts choose to use the net present value, also known as NPV. That is the case for two reasons, which are elucidated in the subsequent paragraphs.
2.1 The advantage over Payback Method
First, NPV examines the time value of money by transforming future cash flows into present-day dollars. Two, it provides a precise figure that Hosted SP Outsourced Sharepoint may use to compare initial cash spent with the present return value (Dikov, 2020).
According to the co-founder and proprietor of business-literacy.com, it is vastly superior to the payback approach, which is the most prevalent(Knight, 2014).
The allure of payback is that it is easy to compute and comprehend: when will Hosted SP Outsourced Sharepoint recoup its initial investment? It does not, however, account for the fact that the purchasing power of money today is larger than that of the same amount of money in the future. According to Knight, this is why NPV is the preferable method (2014).
2.2 Convenience of Use
Thanks to financial calculators and Excel spreadsheets, NPV is now that simple to compute. Hosted SP Outsourced Sharepoint can also utilize NPV to determine whether or not to make significant acquisitions, such as equipment or software. Hosted SP Outsourced Sharepoint Companycan also utilize it in mergers and acquisitions, albeit, in this case, it is referred to as the discounted cash flow model. In fact, this is the methodology that Warren Buffet employs when evaluating businesses. NPV is an excellent choice if a corporation uses present-day dollars to estimate future returns(Knight, 2014)
3. Procedure
3.1 Discount Factor
The discount factor formula provides a method for determining the net present value (NPV) for Hosted SP Outsourced Sharepoint. It is a weighted word used in mathematics and economics to identify the precise factor by which the value is multiplied to get at the net present value as of today.
This is widely used in corporate budgeting to analyze whether a proposal would bring future value.
3.2 Difference between Discount Rate and Discount Factor
Any discount factor equation assumes that money will be worth less in the future owing to causes such as inflation, resulting in a discount factor value between zero and one. The discount factor and discount rate are closely connected; however, whereas the discount rate considers the present value of future cash flows, the discount factor applies to the net present value.
With these numbers, Hosted SP Outsourced Sharepoint can predict the predicted earnings or losses of an investment and its net future value.
3.3 Formula
The formula Hosted SP Outsourced Sharepoint can use for the general discount factor is (Thakur, 2018):
Discount Factor= 1/(1*(1+Discount Rate)^(Period Number) )
3.4 Methodology
To utilize this formula, the periodic interest rate or discount rate must be determined by Hosted SP Outsourced Sharepoint. This is simply calculated by dividing the yearly discount factor interest rate by the number of annual payments.
Additionally, Hosted SP Outsourced Sharepoint will want the total number of payments that will be paid. To perform these computations, Hosted SP Outsourced Sharepoint can generate a discount factor template or table in Excel by inserting the aforementioned formula with our own values. Hosted SP Outsourced Sharepointwill compute it the following way:
Period |
1 | 2 | 3 | 4 |
Cash Flow |
£100,000 |
£100,000 |
£100,000 |
£100,000 |
=1/1*(1+£C£4)^C2) |
=1/1*(1+£C£4)^D2) |
=1/1*(1+£C£4)^E2) |
=1/1*(1+£C£4)^F2) |
|
Discount Factor |
0.93 |
0.86 |
0.79 |
0.74 |
This demonstrates the diminishing discount factor with time, whether it is an annual discount factor or a shorter
time frame to match our accounting period. This applies whether the time range reflects an annual discount factor or a
shorter time frame.
For instance, to determine the discount factor for a cash flow that will occur one year from now, all that needs to be done by Hosted SP Outsourced Sharepoint is divide one by the interest rate plus one. If the interest rate was 5%, the discount factor would be calculated as 1 less than 1.05, which is equivalent to 95%.
3.5 Usage in NPV Analysis
After Hosted SP Outsourced Sharepointhas computed their discount factor and discount rate, they will be able to apply these two factors to the problem of determining the net present value of an investment. The total present value of all positive cash flows should be added together, and the total present value of all negative cash flows should be subtracted.
After making the appropriate calculations using the interest rate, Hosted SP Outsourced Sharepoint will arrive at the net present value. Many discount factor calculators available online will apply these formulas; alternatively, Hosted SP Outsourced Sharepoint may perform an analysis using Excel.
4. Net Present Value
4.1 Case 1: Variable Cash Flow
Calculating both the expenses (which result in negative cash flows) and the benefits allow Hosted SP Outsourced Sharepointto arrive at the Net Present Value of a series of cash flows (positive cash flows).This is accomplished by the utilization of the following formula(Indeed Editorial Team, 2021):
NPV= ∑_(t=0)^n▒〖CF〗_t/〖(1+i)〗^t
Where CFt denotes the cash flow during the period, n is the total number of periods, t denotes the currently active period, and I represent the discount rate of Hosted SP Outsourced Sharepoint(Dikov, 2020).
4.2 Case 2: Constant Cash Flow
The following is an example of a basic finite geometric series that may be used to express the formula if Hosted SP Outsourced Sharepoint projects a consistent cash flow year after year(Indeed Editorial Team, 2021):
NPV= CF*((1-(1/(1+i))^(n+1))/(1- (1/(1+i)) ))
Where CF represents the continuous cash flow throughout each period, n represents the total number of periods, and I is the discount rate for Hosted SP Outsourced Sharepoint(Dikov, 2020).
5. NPV in Capital Budgeting
5.1 Nature of the Project
Before Hosted SP Outsourced Sharepoint can use net present value to evaluate a capital investment project, we will first need to determine if the project in question is independent or part of a chain of mutually exclusive projects (Taylor, 2017).
5.1.1 Independent
It refers to endeavors that are not influenced by the revenue flows generated by other initiatives.
5.1.2 Mutually Exclusive
If two projects are mutually exclusive, it indicates that there are two approaches to achieve the same outcome and cannot be done simultaneously. For example, it's possible that Hosted SP Outsourced Sharepoint may request bids on a certain project and that they've gotten several of those bids.
Hosted SP Outsourced Sharepoint should avoid the temptation to take two different bids for the same project. That illustrates a project that cannot coexist with another(Carlson, 2021).
5.2 Decision Rules
Every approach to budgeting capital expenses includes a list of decision rules. For instance, the decision rule for the payback period approach states that Hosted SP Outsourced Sharepoint must agree to move forward with the project if it is able to earn back its initial investment in a predetermined amount of time(Luehrman, 2016).
The same decision rule should be used when applying the discounted payback time technique. The concept of net present value comes with its own set of decision criteria, which are as follows:
5.2.1 Case 1: Independent Project
Hosted SP Outsourced Sharepoint should accept the proposal if the NPV is larger than zero.
5.2.2 Case 2: Mutually Exclusive Projects
If the net present value (NPV) of one project is larger than the NPV of the other project, then Hosted SP Outsourced Sharepoint will accept the project with the higher NPV. If both initiatives' net present value (NPV)s negative, then neither project should be pursued(Tamplin, 2021).
Consider the following scenario as we go through the process:
5.3 An Example
Let's say that the Hosted SP Outsourced Sharepoint is thinking about two different initiatives: A and B. Hosted SP Outsourced Sharepoint’sCompanycost of capital for each individual project is ten percent, and the initial investment is ten thousand dollars.
Hosted SP Outsourced Sharepoint is interested in determining and analyzing the difference in the net present value of these cash flows between the two projects. Every project has a different pattern of incoming funding. To put it another way, the cash flows do not constitute annuities.
5.3.1 Cash Flows
Hosted SP Outsourced Sharepoint wishes to compute the NPV for each project. The cash flows in each of the four years of Project A are as follows: $5,000, $4,000, $3,000, and $1,000, respectively. Project A is a four-year endeavor. The cash flows in each of the four years of Project B are as follows: $1,000, $3,000, $4,000, and $6,750, respectively. Project B is also a four-year Endeavor.
5.3.2 Calculation
To calculate the NPV of the project, Hosted SP Outsourced Sharepointstarts by adding the cash flow from Year 0, which represents the initial investment in the project, to the cash flows from the remaining years of the project.
The original investment results in a negative cash flow and is therefore expressed as a negative figure. In this illustration, the cash flows for each project for years 1 through 4 are all exemplified by positive numbers.
To get the NPV for Project A, Hosted SP Outsourced Sharepointfollows these steps:
NPV(A) = (-$10,000) + $5,000/(1.10)1 + $4,000/(1.10)2 + $3,000/(1.10)3 + $1,000/(1.10)4
10% | 0 | 1 | 2 | 3 | 4 |
CFs | -10,000 | 5,000 | 4,000 | 3,000 | 1,000 |
NPV | 716.54 |
The NPV of Project A is $716.54, which indicates that investing in the project increases the firm's value by $716.54.
For Project B:
NPV(B) = (-$10,000) + $1,000/(1.10)1 + $3,000/(1.10)2 + $4,000/(1.10)3 + $6,750/(1.10)4
10% | 0 | 1 | 2 | 3 | 4 |
CFs | -10,000 | 1,000 | 3,000 | 4,000 | 6,750 |
NPV | 912.75 |
Since Project B has a higher NPV than A, Hosted SP Outsourced Sharepointcan safely choose Project B instead of A based on our analysis.
6. NPV in Stock Valuation
The most popular approach for evaluating the value of Hosted SP Outsourced Sharepoint shares is the Discounted Cash Flow (DCF) model, which employs Net Present Value (NPV) in its calculation. The DCF model methodology is explained below.
6.1 Initial Steps
Beginning with the revenue statement of Hosted SP Outsourced Sharepoint, we project future (typically five) years' income and expenses(Probasco, 2021). Then, projections are made for fixed assets and changes in the working capital of Hosted SP Outsourced Sharepoint
. The second level is capital structure projection. Depending on the type of DCF model being constructed, the most frequent strategy is to maintain the Hosted SP Outsourced Sharepointcurrent capital structure, assuming no major changes other than those that are known, such as debt maturity(CFI, 2022).
6.2 Terminal Value
The terminal value, a crucial component of a DCF model, is then calculated. It frequently accounts for more than 50 percent of the Hosted SP Outsourced Sharepointnet present value, especially if the forecast term is five years or less. There are two methods for calculating the terminal value: the perpetual growth rate method and the exit multiple methods (Matthiessen, 2019).
6.2.1 Perpetual Growth Rate Method
The perpetual growth rate method assumes that the cash flow created at the end of the projected period rises at a constant rate in perpetuity. Consider that another company is looking to acquire
Company Hosted SP Outsourced Sharepoint, whose cash is $10 million, grows at a rate of 2% indefinitely, with a cost of capital of 15%. $10 million / (15 percent - 2 percent) = $77 million is the terminal value.
6.2.2 Exit Multiple Method
Using the exit multiple method, it is assumed that Hosted SP Outsourced Sharepointwas sold for the price that a reasonable buyer would pay. This often entails an EV/EBITDA multiple equal to or close to the current market values of comparable companies. As seen in the following example, if Hosted SP Outsourced Sharepoint has $6.3 million in EBITDA and comparable businesses are trading at 8x, then the terminal value is $6.3 million x 8 = $50 million.
Entry |
2018 |
2019 |
2020 |
2021 |
2022 |
Exit |
|
Date |
31/12/17 |
30/06/18 |
30/06/19 |
30/06/20 |
30/06/21 |
30/06/22 |
30/06/22 |
Time Periods | 0 | 1 | 2 | 3 | 4 | ||
Year Fraction | 0.5 | 1 | 1 | 1 | 1 | ||
EBIT | 47,814 | 51,095 | 55,861 | 58,693 | 63,039 | ||
Less: Cash Taxes | 11,954 | 12,774 | 13,965 | 14,673 | 15,760 | ||
Plus: D&A | 15,008 | 15,005 | 15,003 | 15,002 | 15,001 | ||
Less: Capex | 15,000 | 15,000 | 15,000 | 15,000 | 15,000 | ||
Less: Cgs NWC | 375 | 611 | 398 | 511 | 272 | ||
Unlevered FCF | 35,494 | 37,715 | 41,501 | 43,510 | 47,008 | ||
(Entry)/Exit | -290,450 | 542,129 | |||||
Transaction CF | - | 17,747 | 37,715 | 41,501 | 43,510 | 47,008 | 542,129 |
Transaction CF | -290,450 | 17,747 | 37,715 | 41,501 | 43,510 | 47,008 | 542,129 |
Intrinsic Value |
|
Enterprise Value | 462,983 |
Plus: Cash | 239,550 |
Less: Debt | 30,000 |
Equity Value | 672,532 |
Equity Value/Share | 33.63 |
Terminal Value |
|
Perpetual Growth | 537,981 |
EV/EBITDA | 546,278 |
Average | 542,129 |
6.2.3 Decision
If we want to determine the equity value of Hosted SP Outsourced Sharepoint, we must adjust the net present value (NPV) of the unlevered free cash flow for cash and equivalents, debt, and any minority stake(Ahern, 2022). This yields the equity value, which may then be divided by the number of shares to obtain the share price. Then, we may determine whether the stock of Hosted SP Outsourced Sharepointis overvalued or undervalued and decide whether to purchase or sell it.
7. Assumptions
Even though the discounted value of future cash flows is not a statement that non-financial individuals easily utter still, it is worthwhile to explain and present NPV due to its superiority, as any investment that passes the net present value test will improve shareholder value. In contrast, any project that fails would actually harm the company and its shareholders if carried out anyhow(Entras, 2016).
There are three potential estimation errors that will have a significant impact on the final outcomes of our calculation.
7.1 Initial Expenditure
First, there is the initial expenditure(Kristiani, 2022). Does Hosted SP Outsourced Sharepoint know how much the project or expense will cost? There is no risk when purchasing a piece of equipment with a visible price tag. But if Hosted SP Outsourced Sharepoint is modernizing its IT system and estimating staff time and resources, the project timetable, and how much it will pay external vendors, the numbers can vary significantly(Jones & Smith, 1982).
7.2 Discount Rate
There are further dangers associated with the discount rate. Hosted SP Outsourced Sharepoint is applying today's rate to future returns, so there is a potential that, for example, in Year Three of the project, interest rates will skyrocket, and the cost of their money will increase(Ionos, 2019).
This would imply that Hosted SP Outsourced Sharepoint’sreturns for that year will be lower than anticipated.
7.3 Anticipated Returns
Third, Hosted SP Outsourced Sharepoint must be confident in the anticipated returns of the project(Mendell, 2020). These forecasts are typically optimistic since people want to complete the project or purchase the equipment(Bey, Doersch, & Patterson, 1981). This, however, can lead to erroneous NPV calculations.
8. Sensitivity Analysis
Given that the computation is based on a number of assumptions and approximations, there is a considerable possibility of a mistake. After our initial computation, Hosted SP Outsourced Sharepoint can mitigate the risks by double-checking our calculations and conducting sensitivity(Borgonovo & Peccati, 2004). The following is one illustration:
8.1 An Example
Cash Flow projections for the following 12 years are offered for Company Hosted SP Outsourced Sharepoint(see below). Capital cost is eight percent. Assuming the variables remain constant, we calculate the Hosted SP Outsourced Sharepoint’s Net Present Value (NPV).
Sensitivity Analysis |
||
Year 0 |
Years 1 - 12 |
|
Investment | ($5,400.00) ” | |
Sales | $16,000.00 | |
Variable Costs | $13,000.00 | |
Fixed Costs | $2,000.00 | |
Depreciation | $450.00 | |
Pretax Profit | $550.00 | |
Taxes (40%) | $220.00 | |
Profit After Tax | $330.00 | |
Operating Cash flow | $780.00 | |
Net Cash Flow | ($5,400.00) ” | $780.00 |
NPV | $470.25 |
Possible Outcomes |
|||
Variable |
Pessimistic |
Expected |
Optimistic |
Investment | 5800 | 5400 | 5000 |
Sales | 14000 | 16000 | 18000 |
Variable Costs | 11620 which is 83% of Sales | 13000 which is 80.25% of Sales | 14400 which is 80% of Sales |
Fixed Costs | 2100 | 2000 | 1900 |
NPV | ($121.00) ” | $470.25 | $778.00 |
9. Conclusion
NPV's significance in predicting the future of Hosted SP Outsourced Sharepoint and its projects is undeniable and an indispensable tool within the field of Financial Analysis. However, it must be remembered that it is expressed in absolute rather than relative terms and hence does not account for the magnitude of the investment, Hosted SP Outsourced Sharepoint opportunity costs, or the project's duration. In light of the limitations and benefits of NPV, it is imperative for Hosted SP Outsourced Sharepoint not to rely solely on it and to undertake assessments using alternative approaches, such as IRR, to be certain.
10. Works Cited
Ahern, D. (2022, June 15). Explaining the DCF Model. Retrieved from eB: https://einvestingforbeginners.com/dcf-valuation/
Bey, R. B., Doersch, R. H., & Patterson, J. H. (1981). The Net Present Value Criterion. Project Management Quarterly, 12(2), 35-45.
Borgonovo, E., & Peccati, L. (2004). Sensitivity Analysis In Investment Project Evaluation. International Journal of Production Economics, 90(1), 17-25.
Carlson, R. (2021, February 8). NPV as a Capital Budgeting Method. Retrieved from The Balance: Small Business: https://www.thebalancesmb.com/net-present-value-npv-as-a-capital-budgeting-method-392915
CFI. (2022, June 2). DCF Model Training. Retrieved from Corporate Finance Institute: https://corporatefinanceinstitute.com/resources/knowledge/modeling/dcf-model-training-free-guide/
Dan. (2013, July 24). Time Value of Money. Retrieved from The Strategic CFO: https://strategiccfo.com/articles/accounting/time-value-of-money/
Dikov, D. (2020, March 13). NPV in Financial Analysis. Retrieved from Magnimetrics: https://magnimetrics.com/net-present-value-npv-in-financial-analysis/
Entras. (2016, April 1). NPV of a Business Case: Common Pitfalls. Retrieved from Entras: https://www.entras.be/news/npv-of-a-business-case-common-pitfalls/
Gallo, A. (2014, November 1). A Refresher on Net Present Value. Retrieved from Harvard Business Review: https://hbr.org/2014/11/a-refresher-on-net-present-value
Indeed Editorial Team. (2021, December 9). How To Calculate Net Present Value. Retrieved from Indeed: https://www.indeed.com/career-advice/career-development/calculate-npv
Ionos. (2019, April 19). What is Net Present Value. Retrieved from Ionos: https://www.ionos.com/startupguide/grow-our-business/what-is-net-present-value/
Jones, T. W., & Smith, J. D. (1982). A Historical Perspective Of Net Present Value And Equivalent Annual Cost. The Accounting Historians Journal, 9, 103-110.
Juhász, L. (2011). Net Present Value Versus Internal Rate Of Return. Economics Sociology, 4(1), 46-53.
Knight, J. (2014, August 1). Financial Intelligence. (A. Gallo, Interviewer)
Kristiani, V. M. (2022, March 5). Net Present Value. Retrieved from Hashmicro: https://www.hashmicro.com/blog/net-present-value-npv/
Luehrman, T. A. (2016, June 10). NPV and Capital Budgeting. Retrieved from Harvard Business Publishing: https://hbsp.harvard.edu/product/5176-PDF-ENG
Matthiessen, A. (2019, March 20). Startup valuation. Retrieved from EY: https://www.ey.com/en_nl/finance-navigator/startup-valuation-applying-the-discounted-cash-flow-method-in-six-easy-steps
Mendell, B. (2020, May 31). Pros and Cons of Using NPV. Retrieved from Forisk: https://forisk.com/blog/2020/05/31/pros-and-cons-of-using-net-present-value-npv/
Probasco, J. (2021, October 20). Net present value: One way to determine the viability of an investment. Retrieved from Business Insider: https://www.businessinsider.com/personal-finance/npv
QS Study. (2018, May 10). Limitations of NPV. Retrieved from QS Study: https://qsstudy.com/limitations-net-present-value-npv/
Tamplin, T. (2021, September 21). Capital Budgeting: Important Problems and Solutions. Retrieved from Finance Strategists: https://learn.financestrategists.com/explanation/management-accounting/capital-budgeting-important-problems-and-solutions/
Taylor, P. (2017, May 13). NPV Analysis. Retrieved from Stantec: https://www.stantec.com/content/dam/stantec/files/PDFAssets/UK/uk-net-present-value-brochure.pdf
Thakur, M. (2018, February 7). Discount Factor Formula. Retrieved from Educba: https://www.educba.com/discount-factor-formula/
Warning! This article is only an example and cannot be used for research or reference purposes. If you need help with something similar, please submit your details here.
Related Articles
- Corporate Social Responsibility of Hosted SP Outsourced Sharepoint
- Hosted SP Outsourced Sharepoint 5C Marketing Analysis
- The vision statement of Hosted SP Outsourced Sharepoint
- Organizational Culture of Hosted SP Outsourced Sharepoint
- Hosted SP Outsourced Sharepoint Generic and Intensive Growth Strategies
- Hosted SP Outsourced Sharepoint Case Study Analysis & Solution
- Hosted SP Outsourced Sharepoint Case Solution
- Ansoff Matrix of Hosted SP Outsourced Sharepoint
- Blue Ocean Strategy of Hosted SP Outsourced Sharepoint
- Hofstede Cultural Model of Hosted SP Outsourced Sharepoint
- Porters Diamond Model of Hosted SP Outsourced Sharepoint
- Mckinsey 7s Framework Of Hosted SP Outsourced Sharepoint
- Resource Based View Of The Firm - Hosted SP Outsourced Sharepoint
- VRIN/VRIO Analysis Of Hosted SP Outsourced Sharepoint
- WACC for Hosted SP Outsourced Sharepoint
Paige Connor
5.0
I’ll come back when I need help again. Very great custom paper writing help! Thank you!
Jessica Benoit
5.0
The result that I got from this paper writing service was above from my expectations. Definitely, I’ll be back soon. Thanks!
Amelia Archie
5.0
The professor accepted the paper without calling for the revision. Thanks a lot!
Taif Viraj
5.0
All the teacher's requirements were met. I'm grateful for an exclusive assignment.
Carmini Daniele
5.0
The paper was top-notch but I felt the need for some points in the methodology section. When I spoke to the writer, he guided me that the points for which I talked about are not much relevant to the topic. I said okay and delivered the document to the teacher. The teacher was content after evaluating the assignment.
Henri Nicolas
5.0
No scam, no high prices and no issue of delivery. Fully pleasant by getting help from this service.
Next Articles
- 23763-Note-on-Behavioural-Finance-Net-Present-Value-Analysis
- 23764-Value-Partners-Group-Ltd-Net-Present-Value-Analysis
- 23765-AquaSafi-Purification-Systems-Changing-the-Operating-Model-Net-Present-Value-Analysis
- 23766-East-Coast-Lifestyle-Expanding-a-Regional-Apparel-Brand-Net-Present-Value-Analysis
- 23767-Pokemon-Go-Virtual-Invading-Reality-Net-Present-Value-Analysis
- 23768-Zara-in-China-and-India-Net-Present-Value-Analysis
- 23769-Red-Star-Macalline-Strategic-Evolution-Net-Present-Value-Analysis
- 23770-Challenges-and-Opportunities-at-the-Protospace-Makerspace-Net-Present-Value-Analysis
- 23771-China-s-State-Owned-Enterprise-Reforms-Then-and-Now-Net-Present-Value-Analysis
- 23772-Pepperfry-com-Marketing-to-Manage-Customer-Experience-Net-Present-Value-Analysis
Previous Articles
- 1-Making-the-Case-Net-Present-Value-Analysis
- 2-Joe-Smith-s-Closing-Analysis-B-Net-Present-Value-Analysis
- 3-Joe-Smith-s-Closing-Analysis-A-Spanish-Version-Net-Present-Value-Analysis
- 4-GMAC-The-Pipeline-Net-Present-Value-Analysis
- 5-On-Writing-Teaching-Notes-Well-Net-Present-Value-Analysis
- 6-Exxon-Corp-Trouble-at-Valdez-Net-Present-Value-Analysis
- 7-Ashland-Oil-Inc-Trouble-at-Floreffe-A-Net-Present-Value-Analysis
- 8-Ashland-Oil-Inc-Trouble-at-Floreffe-B-Net-Present-Value-Analysis
- 9-Ashland-Oil-Inc-Trouble-at-Floreffe-C-Net-Present-Value-Analysis
- 10-Ashland-Oil-Inc-Trouble-at-Floreffe-D-Net-Present-Value-Analysis
Be a Great Writer or Hire a Greater One!
Academic writing has no room for errors and mistakes. If you have BIG dreams to score BIG, think out of the box and hire Essay48 with BIG enough reputation.
Our Guarantees
Interesting Fact
Most recent surveys suggest that around 76 % students try professional academic writing services at least once in their lifetime!